05
2.1 Transportation and handling
Do not open or tamper with
the packaging before installation.
The units should only be moved and
lifted by specialised personnel
trained in these operations.
Check on arrival that the unit has
not been damaged during transport and
that it is complete with all its parts.
To unpack the unit, follow these instructions:
1.Check for visible damage
2.Open the packaging.
3.
4.Dispose of the packaging material in accordance with current legislation, at the
appropriate waste reception or recycling site.
Check that all accessories are packed inside the unit.
2.2 Handling instructions
!
Movement of the unit should be performed with care, in order to avoid damage to the
external structure and to the internal mechanical and electrical components.
2. Installation
!
Also make sure that there are on obstacles or people along the route, to avoid the
danger of c
ollis
ions or cr
ushing and to pr
event the l
ifting or handling device from
turning over.
All the operations listed below must be carried out accordance w
ith current health
and safety r
egulations, both as regards the equipment used and as regards
the
procedur
e follow
ed. Before commenc
ing moving oper
ations
,
check
that
the
lifting
apparatus has ths required capacity for the unit in question.
Summary of Contents for SLIM-C Series
Page 2: ......
Page 34: ...31 5 Appendix 5 1 Exploded view...
Page 36: ...33 5 2 Wiring diagram 5 Appendix...
Page 38: ...NOTES...
Page 39: ......
Page 40: ...www ZAN TIA com...