15
Fitting the Wall Brackets
Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre of the area
in which the hood will be installed.
• Draw a horizontal line at 650 mm above the hob.
• Place bracket
7.2.1
on the wall as shown about 1-2 mm from the ceiling or upper limit aligning the centre
(notch) with the vertical reference line.
• Mark the wall at the centres of the holes in the bracket.
• Place bracket
7.2.1
on the wall as shown at X mm below the
fi
rst bracket (X = height of the upper
chimney section supplied), aligning the centre (notch) with the vertical line.
• Mark the wall at the centres of the holes in the bracket.
• Mark a reference point as indicated at 116 mm from the vertical reference line and 306 mm above the horizontal
reference line.
• Repeat this operation on the other side.
• Drill ø 8 mm holes at all the centre points marked.
• Insert the wall plugs (not supplied) in the holes.
• Fix the lower bracket
7.2.1
using the two screws (not supplied).
• Fix the upper bracket
7.2.1
and the air outlet connection support
7.3
together using the two screws (not sup-
plied).
• Insert the two screws (not supplied) in the hood body
fi
xing holes, leaving a gap of 5-6 mm between the wall
and the head of the screw.
Note: If the hood is to be installed onto a hollow construction or plaster or partition board wall then special
fi
xing screws will be required (not supplied).
INSTALLING THE COOKER HOOD
Summary of Contents for ZHC945
Page 1: ...COOKER HOOD ZHC945 INSTRUCTION BOOKLET ...
Page 2: ......
Page 5: ...5 YOUR APPLIANCE ...
Page 18: ......
Page 19: ......