background image

排風管洞鑽洞

抽油煙機安裝位置

上面兩角釘上鋼釘

調好掛鈎準備安裝

合板

排氣管

(四) 安裝注意事項
   

1

. 排氣管的理想安裝位置為於爐台正對窗戶安裝

       ,可敲下一方玻璃,安裝一塊穿有彎管孔大的
        合板,排氣管由此孔穿出,絕不損壞壁面。
 
  

2

. 若排風管為鑽穿牆洞,鑽洞時應要留意牆壁結

       構和質料,切勿破換牆洞以外之壁面。
 
  

3

. 在壁面畫好鑽洞範圍,在使用電鑽鑽穿牆壁。

 
  

4

. 在已選定的安裝位置上,釘上螺絲釘。

   

5

. 調整機體兩側之掛鈎(吊鐵),將機體懸掛於螺

       絲釘上。
 
  

6

. 先量好彎管正對牆面位置,釘頭與牆壁間最多

       保持 3 毫米距離,作掛鈎之用此舉有助機身保
       持水平。
 
  

7

. 懸掛後,機體要保持一定水平。

 
  

8

. 照已選好排氣管的適當位置,選擇適當長度的

       直管進行裝設。
 
  

9

. 機體前後請調整 2 - 4 毫米的斜度固定機體,以

       保持油槽運行方向順暢。

水平

傾斜

安裝水平:
抽油煙機的安裝應保持水平,
防止油汙從油杯溢出來。

2-4

mm

3

毫米(最大之距離)

螺絲釘

牆壁

5

Summary of Contents for ZHT910X

Page 1: ...XP022572 1 Before using this range hood please read these instructions completely MODEL ZHT910X...

Page 2: ...Index Safety Notice Part List Installation Guidelines P1 P3 P5 P2 Operation Instruction Maintenance and Cleaning Hood Measurement P8 P7 P6 P1 P3 P5 P2 P8 P7 P6 P9 Speci cation Wiring Diagram P9...

Page 3: ...1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 65 75 18 19...

Page 4: ...36 1 2 3 4 19 20 21 22 23 24 25 26 27 28 34 35 5 6 7 8 9 10 11 12 13 14 15 16 17 18 29 30 31 32 33 ZHT910X 6 1 1 2 3 16 x 1 4 3 16 x 1 2 T LED 2...

Page 5: ...3 1 2 3 4 5 ZHT910X a 6 6 x 1 6 5 x 1 b 2 1 c 1 d 1 x 2 3 16 x 1 4 x 2 3 16 x 1 2 x 4 6 1 1 2 x 6 5 x 12 x 1T x 6 x 2...

Page 6: ...4 1 25 2 700 50 3 6 5 1 2 ZHT910X 700mm 50mm...

Page 7: ...1 2 3 4 5 6 3 7 8 9 2 4 2 4mm 3 5...

Page 8: ...6 ZHT910X 1 5 LED 2 3 1 1 2 3 4 1 2 1 2 1 2 5 1 2 3 4 6...

Page 9: ...1 2 3 4 5 6 7 LED ZHT910X 7...

Page 10: ...8 ZHT910X 228 710 135 134 5 155 530 664 365 40 mm...

Page 11: ...9 ZHT910X 12 6 14 9 220V 50Hz 5W LED 710 x 530 x 135 mm 800 x 600 x 220 mm ZHT910X CIRCUIT DIAGRAM FUSE 15A M3 LIGHT BAR WHITE BLACK F 450V AC X 2...

Page 12: ...he kitchen to avoid hazard 10 Do not flame under the range hood 17 The appliance should be positioned 65 75 cm above the cooking range 18 The range hood must be earthed 19 To prevent re hazard in case...

Page 13: ...an Blade right Fan blade cap Fan blade cap Residual pan Water collector Oil cup Shell cover Safety grill Oil dish Heating block Water tank cap Water tank screw Water sensor Water tank Nozzle Plug Wate...

Page 14: ...onds to the voltage in your home 4 Connect the power and switch on the motors and lighting system to check the operation 5 Check the following accessories before installation ZHT910X a Exhaust duct ad...

Page 15: ...glue to the collar and securely attach it to the top of the cooker hood s vent lid Install the cooker hood and exhaust duct to the plastic collar and seal with fast drying glue 6 inch diameter exhaus...

Page 16: ...d and hang the hood on the steel nails and then adjust the hood from side to side and from front and back to a horizontal position 7 Follow the instruction print on the enclosed exhaust duct adapter a...

Page 17: ...and light level it was last turned off at 4 Speed down 1 Press to start steam cleaning process the indication light is illuminate when the range hood is cleaning 2 When steam cleaning process is oper...

Page 18: ...epair or modify the appliance by yourself Repair service including replacement of LED light must only be carried out by qualified technician It is dangerous for anyone other than the above mentioned p...

Page 19: ...8 ZHT910X 228 710 135 134 5 155 530 664 365 40 Unit mm Hood Measurement...

Page 20: ...el Net Weights Gross Weights Hood Size Packing Size Voltage Light Bulb ZHT910X Specification Wiring Diagram GREEN BLACK WHITE REMARKS CAPACITOR 2 5 2 5 f 450V AC FIT AC220V 50Hz CIRCUIT DIAGRAM FUSE 1...

Reviews: