31
Installation instruction
Unpacking
All transit bolts and packing must be removed
before using the appliance.
You are advised to keep all transit devices so
that they can be refitted if the machine ever
has to be transported again.
1. After removing all the packaging, carefully
lay machine on it’s back to remove the
polystyrene base from the bottom.
2. Remove the power supply cable and the
draining hose from the hose holders on the
rear of the appliance.
3. With a suitable spanner unscrew and
remove the central rear bolt A.
4. Unscrew and remove the two large rear
bolts B and the six smaller bolts C.
C
C
E
D
C
C
B
B
A
5. Remove the bracket D, refit the six smaller
bolts C and slide out the relevant plastic
spacer E.
6. Open the porthole, take out the inlet hose
from the drum and remove the polystyrene
block fitted with the adhesive tape on the
door seal.Open the porthole, take out the
inlet hose from the drum and remove the
polystyrene block fitted with the adhesive
tape on the door seal.
7. Fill the smaller upper hole and the two large
ones with the corresponding plastic plug
caps supplied in the bag containing the
instruction booklet.
Positioning
Install the machine on a flat hard floor. Make
sure that air circulation around the machine is
not impeded by carpets, rugs etc.
Check that the machine does not touch the
wall or other kitchen units.
Levelling
Level the washer-dryer by raising or lowering
the feet. The feet may be tight to adjust as they
incorporate a self locking nut, but the machine
MUST be level and stable.
If necessary, check the
setting with a spirit
level.
132966020.qxd 30/01/2008 15.37 Pagina 31