5.0.0 VISUAL INSPECTION PROCEDURE
5.0.1 Visually inspect the exterior of the Octo-Z and its inflator hose, looking for cracks, tears or defects in
the materials that would negatively affect the function of the Octo-Z. If any are found that are not warranty
related, inform the customer that the affected parts will have to be replaced.
5.0.2 Detach the Octo-Z from the Bx Corrugated Hose connection and attach it to the inflator hose QD fitting.
Open the tank valve to apply the proper 120-149 psi (8.2-10.2 Bar) to the Octo-Z. Immerse the Octo-Z and
QD into a pan of water. Look for bubbles showing leaks at sealing points holding back intermediate pressure.
See Photos 1 & 2 for critical locations to observe.
5.0.3 Clean out any debris seen inside the Octo-Z when the Cover/Diaphragm Assembly is removed.
5.0.3.1 Sometimes the cover can be difficult to remove. If the Cover Ring (33) cannot be turned by hand
even after running hot water for several minutes over the body, try inserting a slim screwdriver under the
cover through two of the side vents as shown in Photo 2B below.
Carefully
turn the cover and ring counter-
clockwise and the cover should come loose.
Photo 1
Photo 2
7
Photo 2B