EZInstall Kit V2 Installation 

Mounting the Kit 

 

The kit should be mounted as shown in the illustration above.  Recommended positioning 

would be to install as far forward in the cabinet as possible, putting the flipper solenoids 

(furthest forward solenoids on side panels) close to the flipper switches ensuring the best 

response and feedback for them as possible. Ensure that at least ¾” (19mm) space is left 

between the top of the solenoids and the bottom of the playfield monitor. 

Install the side panels with the slot opening to the rear of the kit on a slight downward angle 

toward the front and in a parallel position in the cabinet and slide the mainboard into the slot 

from the rear.  

Use mounting screws appropriate in length to the thickness of your cabinet construction and 

install them in the mounting holes provided making sure not to puncture the outside face of 

the cabinet.  

 

Summary of Contents for EZInstall Kit V2

Page 1: ...for them as possible Ensure that at least 19mm space is left between the top of the solenoids and the bottom of the playfield monitor Install the side panels with the slot opening to the rear of the k...

Page 2: ...kit is interrupted please check and reset the circuit breaker if necessary Make sure the 110v 220v selector is set to the correct AC voltage for your country Installation of the wiring using a plug v...

Page 3: ...2V distribution board are provided to supply additional 12V toys if desired There is a 10A standard automotive blade fuse in the black fuseholder below the power supply protecting the booster module r...

Page 4: ...Connect the right panel connectors to the corresponding connectors on the mainboard as shown in the illustration below...

Page 5: ...ide of the toy to the open port on the booster board and connect the positive side of the toy to the appropriate positive voltage source 12V is supplied by the kit other voltages will require an addit...

Page 6: ...ar Connections Ensure that the 6 pin connector at the left of the bar is connected to the left panel as previously described and connect the 8 pin connector at the right side to the booster board as s...

Page 7: ...From Left to Right the pinout for the Solenoid Bar and Right Panel connectors is as follows...

Page 8: ...USB Cable Connection Connect the USB cable from the PacLED64 shown below to a free USB port in your computer...

Page 9: ...ight mode switch has been installed which will allow you to turn off the booster board controlling the solenoids shaker motor and replay knocker Enough cable has been provided to allow for remote moun...

Page 10: ...y knocker don t play nicely with pwm it causes a huge draw in power this pattern needs to be turned off To turn off the demo pattern you will need to download the pacled64 utility from here https www...

Page 11: ...screen and click the Start Recording to Flash button After about 20 seconds or so click on the stop recording to flash button Click on the OK button and exit the utility BEFORE turning on the NIGHT M...

Page 12: ...DOF Configuration Standard Kit Settings...

Page 13: ......

Reviews: