5
Operating and maintenance instructions for the ventilation unit
SAFETY
General information
Electrical safety
Always check that the supply voltage to the
equipment is switched off before opening the
service hatch.
Only an authorised electrician may open the
electrical box.
In case of a malfunction, always determine the
reason for the malfunction before restarting the
unit.
When you have switched off the power to the
unit, wait for two (2) minutes before starting the
maintenance work. Even though the power is
switched off, the fans continue running and the
post-heating coil remains hot for a while.
DANGER
DANGER
WARNING
WARNING
If you need technical support, please check the
equipment type and serial number from the type plate.
TYPE PLATE
IP 20
Type label
1234567890
Ventilation unit
TYPE:
W/ V/ HZ/ A: 1141/230,1~/50/6.1
www.enervent.com
Summary of Contents for Svea eAir
Page 1: ...Operating and maintenance instructions for the ventilation unit Svea eAir...
Page 24: ...24...
Page 27: ......