ZEISS
5 Operation | 5.1 Prerequisites for Commissioning and Operation
5
Operation
This chapter describes switching on/off the microscope as well as the first operating steps with
the microscope.
Info
For additional information and detailed descriptions, refer to further applicable documents or
ask your ZEISS Sales & Service Partner.
Info
Further information on the software and its operation is available in the
software’s
online help.
5
.1 Prerequisites for Commissioning and Operation
The following basic prerequisites are necessary for commissioning and operation:
§
The Instruction Manual was read prior to commissioning or operation and kept for further
use.
§
§
The chapter
Safety
was read and understood.
When using a Microsoft Surface Pro: The operator is acquainted with the general Windows-
based programs.
§
§
When using an
Apple®
iPad
Pro®:
The operator is acquainted with the general
iOS®
-based
programs.
If required: Basic training and safety briefing were successfully completed.
5
.2 Switching On the Microscope
Prerequisite
ü
The microscope is connected to the mains [
Procedure
1. Set the
Power
switch to position
I
.
à
The power indicator lights up with blue light.
à
When the initialization is finished, the indica-
tor turns to green light.
2
3
4
. Switch on the
Apple®
iPad
Pro®
or the Windows Surface Pro.
. Open the Labscope software.
. Follow the instructions given in the Labscope Online Help.
9
The microscope is operational.
Instruction Manual ZEISS Axiovert 5 digital | en-US | Rev. 1 | 431030-7021-101
33