QUICKSTART
LSM
510
Carl Zeiss
Switching on the System
LSM 510 META
4-10
B 45-0008 e 10/02
4.2.2
Switching on the Enterprise UV
Laser
•
If the UV laser is required, switch it on via the
toggle switch (4-6/
1
) of the power supply.
−
It will be ready for operation after a few
seconds.
4.2.3
Starting the LSM 5 Program
The LSM 5 software program can be operated in
two different modes (with or without connected
instrument system). In the on-line mode, the entire
program package (image recording and analysis) is
available, while only a part of the software
functions (image analysis only of already stored
images) and no hardware functions are available in
the off-line mode. Of course, the off-line mode
can also be started when the instrument system is
connected. In that case, it is not necessary that the
lasers and the microscope are switched on.
•
Double-click on the
LSM 510
icon on the desktop of WINDOWS to start the LSM 5 software program
(see Fig. 4-5).
−
The
LSM 510 Switchboard
menu appears on the screen (see Fig. 4-8).
Fig. 4-6
Power supply of UV-Ar laser
Fig. 4-7
Starting the LSM 5 software
Summary of Contents for LSM 510 META
Page 1: ...LSM 510 and LSM 510 META Laser Scanning Microscopes Operating Manual Release 3 2...
Page 8: ...INTRODUCTION LSM 510 Carl Zeiss LSM 510 META VIII B 45 0008 e 10 02...
Page 10: ...NOTES ON DEVICE SAFETY LSM 510 Carl Zeiss Contents LSM 510 META 1 2 B 45 0008 e 10 02...
Page 20: ...NOTES ON DEVICE SAFETY LSM 510 Carl Zeiss LSM 510 META 1 12 B 45 0008 e 10 02...
Page 22: ...LSM 510 SETUP REQUIREMENTS LSM 510 Carl Zeiss Contents LSM 510 META 2 2 B 45 0008 e 10 02...
Page 52: ...QUICKSTART LSM 510 Carl Zeiss Contents LSM 510 META 4 2 B 45 0008 e 10 02...