Pull line blowing in conduits (ø 18-50 mm)
EZ50 Operating manual version 11/2018
page 11 / 24
6.
Inserting the pull line roll
1.
Disconnect the main plug
2.
Release the line brake
3.
Open and remove front plate
A
4.
Take out any remaining pull line
5.
Carefully remove the plastic foil from the new line roll
6.
Insert line roll so START label is visible
7.
Remove START label and thread end of line through front plate
B
8.
Replace the front plate and close it with the bayonet catch!
9.
The correct positioned line roll must have a little clearance all around it
10. Blow out approx. 5 m of line