background image

Connect the outlet

Connect the outlet to a suitable sewage point

close to the unit

,

Remove the foam padding

Make sure the test valve is closed, turn to the

right to close

Fill the unit with clean water

Fill the unit until the outlet point and

replace the foam padding

Replace the poly element on top of the water,

the element will float.

Do not push the element down!

Replace the lid with indicator on the poly tower.

Your machine is ready for operation now!

Reviews: