5. INSTALL FILTRATION SYSTEM
A. Pump Manifold
B. Water Pump & UV Water Filter
C. Filter Bag (at front of tank)
D. T Fitting
E. 90 Degree Fitting
1. Start by setting the Water Pump and UV Water Filter (B) in place.
2. Once your Water Pump and UV Water Filter (B) are in the right position, screw
the Pump Manifold (A) on top of it. This would be the time to make sure it aligns
well with your filter bag (C) in place. Adjustment may be necessary.
3. Once A,B, and C are in place it is time to add the rest of the filtration line. The
hoses should connect together with some force. Be sure to use the T Fitting (D)
in the middle, followed by the 90 Degree Fitting (E) at the end.
14