background image

Page 12 of 12 

 Zip Hydroboil - Installation & Operating Instructions - 81433 - June 2012 v1.01

Contact Information

Head Office

Zenith Heaters Limited,
Unit 2/15 Moselle Avenue,
Henderson.
Auckland.  0610
New Zealand.

www.zenithheaters.co.nz

Telephone: 0800 558055
Facsimile:  0800 559055

Registering your product:

Registering your Zenith installation on  the Zenith Heaters Limited website may 
help to establish date of installation, should it become necessary to service 
the appliance, under the terms of Zenith Heaters Limited warranty. To register 
your installation go to www.zenithheaters.co.nz and look under the heading 
“Warranty”.

As Zenith Heaters Limited policy is one of continuous product improvement, 
changes to specifications may be made without prior notice. Images in this 
booklet have been modified and may not be true representations of the 
finished goods.

In order to help preserve our environment we ask that you dispose of this 
product correctly. Please contact your local city council for collection centre 
details.

Summary of Contents for Autoboil 01652

Page 1: ...Instructions 81433 June 2012 v1 01 Page1 of 12 Installation and Operating Instructions Autoboil Instant boiling water 01652 Autoboil 1 5 Litre White 03652 Autoboil 3 0 Litre White 05652 Autoboil 5 0...

Page 2: ...Page 2 of 12 Zenith Autoboil Installation Operating Instructions 81433 June 2012 v1 01 Intentionally left blank...

Page 3: ...5 Step 2 Fastening 5 Step 3 Connecting 6 a Plumbing 6 b Venting 6 c Electrical 6 Step 4 Assembling 6 Step 5 Commissioning 6 Wall Mounting Template Dimensions Electrical Diagram 7 Problem Solving 8 Ea...

Page 4: ...t use strong corrosive or abrasive cleaners to clean the case of the heater Frost protection If this heater is located where ambient air temperature could fall below 5 C when the heater is not in use...

Page 5: ...aining board or drip tray Position the base of the tap to be not less than 200 mm above the draining board height should be increased only if essential for filling larger vessels Provide clearance for...

Page 6: ...or concealed vent plumbing connect plumbing to the vent outlet from the heater rear using a capillary elbow protruding 45 mm from the wall Alternatively attach a tun dish to the wall as shown and plum...

Page 7: ...ing Template Dimensions Electrical Diagram 1 5L 3 0 L 5 0 L 7 5 L 65 CLEAR 56 COLD INLET 72 15 25 35 42 POSITIONING PIN VENT EXTERNAL PLUMBING ELECTRICAL WIRING POSITION INTERNAL PLUMBING BENCH TOP 31...

Page 8: ...th authorised agent Warning this appliance must be earthed Following remedial service the earthing continuity of the heater must be checked by a qualified technician using an appliance tester or conti...

Page 9: ...ing water will flow until the tap handle is released This operation gives fingertip flow control for safe filling of cups and mugs To fill larger vessels such as teapots and saucepan s rotate the tap...

Page 10: ...rload kit Autoboil 2000B 14 90501NZ Tap Top Kit Autoboil 2000B 15 90562NZ Tap Assy complete 2000B 16 90503NZ Strap and key kit 1 5 3L 2000B 16 90504NZ Strap and key kit 5 7 5L 2000B 17 90505NZ Tap nut...

Page 11: ...Zenith Autoboil Installation and Operating Instructions 81433 June 2012 v1 01 Page11 of 12 Spare Parts...

Page 12: ...tallation should it become necessary to service the appliance under the terms of Zenith Heaters Limited warranty To register your installation go to www zenithheaters co nz and look under the heading...

Reviews: