20
Quick Start Installation Guide
806836NZ v1.02 02.22 G5 B BA Quick Start Guide
SECTION 12: Commissioning
12:12 PM
COMMISSIONING
Your HydroTap is designed to be used frequently,
do not commission until ready for use.
Please follow commissioning guidelines
in the manual.
• Touch the arrow to continue when ready
to start using the HydroTap.
DATE & TIME
2021
Dec
06
10
50
:
24 hr
Time
Mon
12:12 PM
• Touch the date and time, use "-" or "+" to
make adjustments. When ready, touch
the arrow to continue.
12:12 PM
DRAIN AWAY OPTION
Does your tap drain into a:
Or
Sink/Container
Font
If you are not clear on your selection options
refer to the commissioning instructions.
• Select 'Sink / Container' or 'Font'
depending on the model , see below.
• Select 'Font' if the HydroTap is mounted
on a font.
• Select 'Sink / Container' if the HydroTap
is mounted such that the waste water
dispenses into a sink, or container.
• Note
This selection will determine if water is dispensed automatically or
requires operation of the tap during the tank flush process.
• Touch the arrow to continue.
Font
Sink
Container