MUGL
Page 10 of 38
rev. 18 November 2009
2.3
Equipment operation
Connect the equipment to the power mains,
it is recommended to follow the
instructions given on the equipment (or in the attached sheet) regarding voltage,
frequency and earth connection,
then turn on the power switch, which could be located
on the back panel or by the cabinet side depending on the type of equipment.
In some models the power-on command can be part of an external power supply frame.
In some cases the integrated console, keyboard/display, can be connected to the cabinet
by means of an external cable.
At system power-on a self-diagnostic routine tests the most important equipment
functionalities and detects eventual faults.
In case of failures or malfunctions, we must be informed in advance before sending the
equipment to our laboratories.