9
7
3/4
”
7”
10-
1/8”
19-
7/8”
C/L
1-
15/16”
*1
1-
1/2”
*6-
3/16”
7”
Installation –
Preparing the Cabinet
Fig.2
front edge
glass handle
1. Determine and mark center line on wall and cabinet bottom with a pencil.
2. If the cabinet bottom is recessed, wood blocking must be installed to ensure proper
DOLJQPHQWRIWKHKRRGZLWKWKHFDELQHWERWWRP:RRGEORFNLQJVKRXOGEHÀXVK
within cabinet bottom.
3. Follow the dimensions in Fig.1 and cut-out the bottom of your cabinet to create an opening
IRUWKHKRRGWR¿WWKURXJK)RUIUDPHOHVVFDELQHWPHDVXUH´IURPWKHIURQWRI
cabinet door. For framed cabinet measure 1-15/16” from front of cabinet bottom.
Fig.1
*
Dimension used for rear ducting option
Summary of Contents for Pisa ZPI-E30AG
Page 2: ...www zephyronline com...
Page 20: ...18 www zephyronline com Wiring Diagrams VOLTS...
Page 26: ...www zephyronline com...