Z 2500-130/150
14
Before installation
www.zepro.com
3.5
Prepare the tail lift
1. Position the support frame under the vehicle’s chassis.
2. Remove the protective cover mounted using to quick release locks; see
Image 15.
3.
Fold out the control card / relay card (B) and loosen the cabling at the connector on the hydraulic unit; see
Image 16
and
Image 17.
4.
Release the hydraulic unit by unscrewing the wing nut and corresponding screw (C); see Image 18 and
pull out the hydraulic unit until the tank cap is accessible; see Image 20.
m
CAUTION!
Make sure no cables are pinched or in any other way damaged when the control card / relay card is
folded out or removed. Do not pull out the hydraulic unit more than necessary; make sure it is not
pulled completely out of the frame, as this can entail a risk of injury and damage to the equipment.
Image 15.
R
emove the protective cap
C
A
B
Image 16.
R
elease mechanism
Image 17.
C
onnection socket
Image 18.
R
eleasing the hydraulic unit
Summary of Contents for Z 2500-130
Page 2: ......
Page 63: ...Z 2500 130 150 Specifications 63 www zepro com...