Z3N/Z3NU/Z3NN/Z3NNU/Z3NW/Z3NWU 75-100
Installation
25
www.zepro.com
4.4
Underrun protection
The underrun protection consists of a bracket and two aluminium profiles.
Install the underrun protection:
1.
Screw the bracket firmly to the lift's arm in existing holes. Use 2 M12x45 on each side.
Tightening torque 80 Nm.
2.
Screw each aluminium profile in place with 2 bolts M8x40 (8.8) each. Tightening torque 25 Nm. Place the
head of the screw into the aluminium rail’s groove and fit into the bracket and screw tight.
Check that the statutory measurements are kept. See section 3.2. In addition, check the space for any tow
bars and draw bars.
Image 39. Installing underrun protection
M12x45 8.8 (80 Nm)
M8x40 8.8 (25 Nm)
Summary of Contents for Z3N 75-100
Page 2: ......