ZDK 250 135/155
Installation
23
www.zepro.com
4.2
Platform
1. Check that all included components are clean,
cleaning them where necessary.
2. Lubricate the metal bushings on the upper bear-
ing of the arms. Ensure that the small holes on
the inside of the bushings are filled with grease.
See Image 30.
Use Zepro lubricant or the equivalent.
IMPORTANT
!
Carefully lubricate the metal bushings on the upper
bearing of the arms. Make sure the small holes
are filled with grease. After installing the platform,
grease all bearings including the two regular grease
nipples; see section "9 Lubrication and oil level
check" on page 56.
3. Fit the platform to the arms using the supplied
shafts and screws. Tighten the bolts using a
torque wrench.
Tightening torque: 80 Nm.
NOTE!
Lubricate the bushings
4. Fit one of the tilt cylinders to the platform. Use
the supplied shaft and support wheel.
IMPORTANT
!
Make sure the cylinder is installed with the grease
nipples facing up.
Tighten the bolts using a torque wrench.
Tightening torque: 80 Nm.
Image 30. Carefully lubricate the metal bushings
Image 31. Fitting the platform to the arms
Image 32. Fitting the tilt cylinder to the platform
Summary of Contents for ZDK 250 135
Page 2: ......
Page 65: ...ZDK 250 135 155 Registration 65 www zepro com...