4-18
M2
Example:
If the total is between 90 to 100 mm (3.5 to 4.0 in),
the sag is correct. If it is not within 90 to 100 mm
(3.5 to 4.0 in), the spring pre-load should be
adjusted. See Spring Pre-load Adjustment.
M1
600 mm (23.6
in)
M2
-
500 mm (19.6
in)
Sag
=
100 mm
(4 in)
8.
Have a second assistant take a
measurement using the same locations
as in step 2.
9.
Record this measurement, this will be
measurement M2.
10. Subtract the second measurement (M2)
from the first measurement (M1).
Summary of Contents for DS 2010
Page 1: ......
Page 5: ...TOC 4 NOTES...
Page 18: ...1 13 NOTES...
Page 19: ...1 14 NOTES...
Page 23: ...2 4 Power Pack Information Label 7...
Page 29: ...2 10 NOTES...
Page 41: ...3 12 NOTES...
Page 61: ...4 20 NOTES...
Page 64: ...5 3 B C J I H F E D G See Bolt Torque Table on page 5 2...
Page 65: ...5 4 L M K See Bolt Torque Table on page 5 2...
Page 88: ...5 27 NOTES...
Page 89: ...5 28 NOTES...
Page 101: ...6 12 NOTES...
Page 110: ...7 9 NOTES...
Page 111: ...7 10 NOTES...
Page 118: ......