REF #0907-53
11
CONVEYOR BELT ASSEMBLING AND DISASSEMBLING INSTRUCTIONS:
Install belt so it always runs in the
direction indicated by this arrow.
Closed end of loop towards direc-
tion of travel.
The arrows in the belt illustrate the
movement of the splicing strand
between steps.
When bending the splicing strand,
try to limit bending to straight por-
tions of the strand rather than in
the "Z" bend area.
Splice one side completely before
starting the other side.
After completely splicing the belt,
it is advisable to go along the
width of the belt straightening the
spliced-in strand.
NOTE: DEPENDING ON WIDTH
OF BELT THERE MIGHT BE
ONE, TWO OR THREE
SPLICING STRANDS.
Summary of Contents for CE 2416
Page 14: ...REF 0907 53 14 ...
Page 18: ...REF 0907 53 GEAR MOTOR 18 2416 2418 3018 4018 3624 3632 4824 4832 6024 6032 4032DD 653DD ...
Page 21: ...REF 0907 53 21a ...
Page 22: ...REF 0907 53 21b ...
Page 23: ...REF 0907 53 22a ...
Page 24: ...REF 0907 53 22b ...