EXPro Installation Manual
Approved Document No: GLT-212-7-1
Page 6
Issue: 1.7 Author: MF/NRPJ Date: 05/07/2021
INDICATIONS & CONTROLS
INDICATIONS
Here is the fascia for the Premier EXPRO panel.
Figure 1. EXPro fascia layout
Each function has its own indication LED. There are Alarm (Active), Fault, Test & Disablement LEDs
for most panel inputs and outputs. For most functions, more than one LED will light (e.g. zone 1 fire
and common fire)
The second stage sounder is pulsed during the activated condition, and its sounder active LED will
also pulse in time with the actual sounder output. The second stage sounder and its associated LED
will switch to constantly on.
The panel also has a 20 x 4 LCD display for easy setup of the engineering functions. It also has an
event log which will store up to 249 events.