INFINITY ID2 INSTALLATION MANUAL.
Software Versions: PANEL 1.N & LOOP O.N
Approved Document No: GLT-211-7-1
Issue 1.9 Author: MG/NJ Date: 06/04/2016
PAGE 26
These are the Triggers that will cause the I/O`s relay to operate
EG the option ZONAL DETECTOR would cause the I/O`s relay to operate if there is an alarm from a Detector in
its Zone.
12.8.2 SETTING INDIVIDUAL I/O UNIT OPERATION - RELAY
To alter the operation mode of an individual I/O unit, go to configuration menu 2
Select Edit Device.
Scroll to the required Address
Press button 8 (V) to cycle through the different
V
ariations of I/O configuration
12.8.3 SETTING INDIVIDUAL I/O UNIT OPERATION - INPUT
To alter the INPUT mode of an individual I/O unit, go to configuration menu 2
Select Edit Device.
Scroll to the required Address
Press 6 (O) to cycle through the different Triggering
Options of I/O configuration
The different options are:-
Letter Description
Use
A
ALARM
I/O signals general alarm when operated. Default setting. Used
when automatic & manual alarms are treated the same.
M
MANUAL CALL POINT ALARM
I/O signals a MCP alarm when operated. Used when device being
monitored is Manually triggered, and the system is set to distinguish
manual & automatic alarms.
P
PREALARM
I/O signals a Pre-Alarm when operated. Used when a device being
monitored needs to give a warning signal , but not an alarm signal.
F
FAULT
I/O signals a Fault Signal when operated. Used when a device being
monitored does not have a normally closed fault relay
D
DISABLE RELAYS
I/O sets all connected I/O relays as disabled when operated. Used
when user testing of the panel needs to suspend relay operation to
avoid shutting down connected equipment. Turning off the input re-
enables the relays
12.8.4 I/O UNIT OPERATION - PANEL LINK
The panel link option is used as a simple alarm link between panels. When an interface is configured as a panel
link, it`s alarm input is non- latching. The relay will not operate if it`s input signalled alarm, but will operate on any
other alarm. The general set-up is to link the input of the I/O to an alarm relay on the remote panel, and then the
relay of the I/O unit connects to a non latching alarm input on the remote panel.
I/O Zn-D
A
Normal
Plant Room
Zone:01 ID:01
I/O Zn-D
P
Normal
Plant Room
Zone:01 ID:01