PREMIER AD INSTALLATION MANUAL.
Software Version :PANEL-R1578 & LOOP-R1062
Approved Document No: GLT.MAN-105A
PAGE 7
Issue : 2.02 Authorised: GH Date: 16/07/2007
5. MOUNTING THE FIRE ALARM PANEL
The Premier AD comes with many cable entry holes. If another entry hole is required, it is strongly
recommended that the panels door be removed to avoid accidental damage. Also, the termination
PCB should be removed and stored in a safe place. This would also help while fixing the back box to
the wall.
5.1 PLANNING CABLE ENTRY
Fig.2 below shows the location of the cable entries to facilitate planning of wiring (home runs) to be
brought to the panel.
The grommets can be easily removed by a push from inside the control panel box.
If a grommet is removed, fill the hole with a brass cable gland. If any knockout is removed, but
subsequently not used, it should be covered up.
The 230Va.c. Mains cable must be fed into the enclosure via one of the cable entries at the top right
corner of the back box. (Refer to “Connecting the Mains” on Page 8).
5.2 FIXING THE BACK BOX TO THE WALL
Figure 2: Plan view inside the enclosure without PCBs. Side view for surface installation.
485mm
100mm
39
5m
m
430mm
27
5mm
Wall Mount
Flush Mount
73mm
95mm
Fix the enclosure to the wall using the three mounting holes provided.
Check the build & condition of the wall to decide a suitable screw fixing.
The mounting holes are designed for No 8 roundhead or countersunk woodscrews (or similar).
Remove any debris from the enclosure.
Take care not to damage the FACP during installation.