PREMIER QUATRO INSTALLATION MANUAL
Software Versions: PANEL 1.52 & LOOP CARD 2.0
Doc No. GLT.MAN-134
PAGE 12
Issue: 1.33 Author: GW/NJ Date: 14/1/2013
6.2 CONNECTING THE BATTERIES
SOUNDER
CIRCUIT
DETECTION
LOOP
MAINS
IN
EARTH BAR
Figure 4: Battery location and connection details.
To calculate the exact requirement, use the equation in section 20. STANDBY BATTERY REQUIREMENTS.
The two batteries are wired in series.
The
+ve
of one battery is connected to the
red
battery lead.
The
–ve
of the other battery is connected to the
black
battery lead.
The –ve of the first battery is connected to the +ve of the second battery using the link wire supplied.
The battery leads will be factory-fitted to either the 5A PSE or to the motherboard (depending upon which version of the panel has
been supplied).
Recommended Battery Types:
Small / Lightly loaded systems – Powersonic 12V, 7 Ah; Heavily loaded systems, or systems requiring longer stand by – Powersonic
12V 17 Ah. Other makes and sizes of battery may be suitable. Calculate the standby requirements to determine the most suitable
size of battery