Checks and Service
General Information
This section provides detailed information about the service procedures necessary to maintain trouble-free
operation of the machine. Specific values for individual tasks can be found in the attached table.
Service inspections
Service inspections are performed as follows:
The first service inspection at the state of the engine hour counter of 50 EH maximum, but not later than
6 months after commissioning of the tractor. The second service inspection after covering another 450 EH
(at the state of the engine hour counter of 500 EH maximum) but not later than 12 months after the first
service inspection. Next service inspections always after covering another 500 EH but not later than 12
months after the previous service inspection. The service inspections are a part of tractor maintenance. The
services authorized by Zetor will provide professional performance of service inspections according to the
manufacturer's instructions.
Pre-Start Checks
To avoid problems it is recommended that a range of checks be carried out daily before starting the tractor.
Checking Engine Coolant
Inspection
Warning:
Do not open the cap when the engine is hot. Otherwise, hot steam can burn you
seriously. Wait until the engine is sufficiently cooled down.
Check that the coolant level in the tank is between MAX
and MIN levels. If not sufficient, top up coolant.
1. Expansion Vessel Cap
HODP094
If corrosion is evident in the coolant, completely drain the
system and fill with a new mixture of water and antifreeze
or corrosion inhibitor.
1. Drain Tap
HODP095
MAINTENANCE
81
Summary of Contents for HORTUS HS Series
Page 1: ...OPERATOR S MANUAL HORTUS HS CL 2 2019 65 Tractor is Zetor Since 1946...
Page 3: ...2...
Page 9: ...8...
Page 43: ...NOTES 42...
Page 106: ...Position of the Fuse HODP163 MAINTENANCE 105...
Page 129: ...NOTES 128...
Page 137: ...NOTES 136...