Installation and Operating Instructions V04 32
1.
Loosen the screws of the cover using a screwdriver (T25) and remove the cover.
(see Section 5 "Electrical Connection ").
2.
Unscrew the swivel nut of the M25 cable gland, remove the filler-plug from the
cable gland and keep it well. If there is only one communication cable, please keep
a filler-plug in the remaining hole of the sealing ring against water ingress.
3.
Route the communication cable into the inverter through the M25 cable gland, and
connect it to the RJ45 keystone socket on the upper cuicirt board.
4.
Connect the inverter to ZeverCom/ZeverManager or another communication
device via the above- mentioned communication cable.
5.
Press the sealing ring with the network cable into the
cable gland, and then tighten the swivel nut firmly
(torque: 2.5-3.0Nm). Make sure the cable gland is
mounted properly. The cable gland must be
adequately locked to prevent any movement of the cable.
6.
Secure the cover (torque: 2.5 Nm) using a screwdriver (T25).
Disassemble the communication cable
in
reverse
order.
M25 cable gland for RJ45