Installation and Operating Instructions V04 38
1. Loosen the screws of the cover using a screwdriver (T25) and remove the cover.
(see Section 5.4.2).
2. Unscrew the swivel nut of the M25 cable gland, remove one filler-plug from the
cable gland and keep it well. If there is only one network cable, please keep another
filler-plug in the remaining hole of the sealing ring against water ingress.
3. Insert the network cable into the RJ45 socket on the upper circuit board(ComBox).
4. Connect the inverter to DRED via the abovementioned network cable.
5. Press the sealing ring with the network cable into the cable gland, and then tighten
the swivel nut firmly. Make sure the cable gland is mounted properly. The cable
gland must be adequately locked to prevent any movement of the cable.
6. Secure the cover (screw driver type: T25,torque: 2.5Nm).
Damage to the inverter due to moisture and dust penetration
• If the cable gland are not mounted properly, the inverter can be
destroyed due to moisture and dust penetration. All the warranty
claim will be invalid.
• Make surethe cable gland has beentightened firmly.