PLAN THE INSTALLATION
Page3-1
3
PLAN THE INSTALLATION
3-1 S
YSTEM
R
EQUIREMENTS
The first step when installing a System is to carefully plan the
installation. This includes finding proper mounting locations for
the Processor(s) and Control Heads. The decision must be made
on where power is going to be sourced and how the power will be
routed to the Processor(s). Once the locations have been decided,
lengths of electrical wiring, Harnesses and push-pull cables must
be determined.
• Bonding is required for maximum electromagnetic compatibility
(EMC) performance. Refer to Bonding: A.B.Y.C. E-11, 46 CFR
111.05, page A-33
• Locate the Processor such that the push-pull cables have the short-
est, most direct path to the selector lever. The push-pull cable
length should not exceed 20 feet (6,0m), the bend radius should
not be less than 10 inches (254mm) and the total degrees of bends
must be less than 270 degrees.
Only when the previous items have been completed, should you
start the actual installation. The following sections describe the
requirements for installing the components and selecting mounting
locations.
NOTE: ZF M
ATHERS
RECOMMENDS
THAT
THE
SYSTEM
BE
INSTALLED
IN
ACCORDANCE
WITH
ABYC, E-
11
AND
P24.
Figure 3-1: Processor Dimensions
4.75
(120,7mm)
3.20
(81,3mm)
10.25
(260,4mm)
10.40
(264,2mm)
6.70
(170,2mm)
2.69
(68,3mm)
10.71
(272mm)
2.70
(68,6mm)
12256-
Summary of Contents for ClearCommand 9000 Series
Page 132: ......
Page 133: ...APPENDIX A...
Page 134: ......
Page 139: ......
Page 140: ...Page A 4...
Page 143: ......
Page 144: ...10...
Page 148: ...Page A 18...
Page 149: ...Page A 19 TEMPLATE...
Page 150: ...Page A 20...
Page 152: ...Page A 22...
Page 154: ...Page A 24...
Page 156: ...Page A 26...
Page 157: ...Page A 27 Drawing 11488D 1 Twin Screw Single APS Connection Alternate Remote Switch...
Page 158: ...Page A 28...
Page 159: ...Page A 29 Drawing 11488D 2 Twin Screw Dual APS Connections...
Page 160: ...Page A 30...
Page 161: ...Page A 31 Drawing 11488D 3 APS Notes Page...
Page 162: ...Page A 32...
Page 164: ...Page A 34...
Page 166: ...Page A 36...
Page 170: ...Page A 40...
Page 172: ...Page A 42...
Page 176: ...Page A 46...
Page 178: ...Page C 48 ZF Mathers LLC 12125 Harbour Reach Drive Suite B Mukilteo WA 98275...
Page 179: ...APPENDIX B...
Page 180: ......
Page 234: ...Appendix B 6...
Page 238: ...Appendix B 10...
Page 242: ...Appendix B 14...
Page 247: ...Service Field Test Unit Reference Manual MM13927 Rev E 4 07...
Page 248: ......
Page 250: ...Page ii Table of Contents...
Page 264: ...SERVICE FIELD TEST UNIT MM13927 RvD 10 03 Page 3 2...
Page 265: ...APPENDIX C...
Page 266: ......
Page 267: ...Appendix C 1 Drawing 12284A 1 ClearCommand Diagram all options...
Page 268: ...Appendix C 2...
Page 269: ...Appendix C 3 Drawing 12284A 2 ClearCommand Circuit Board Connections...
Page 270: ...Appendix C 4...
Page 271: ...Appendix C 5 Drawing 12284A 3 ClearCommand Drawing Notes Page...
Page 272: ...Appendix C 6...