ZGR SCALABLE 60
– 300 KVA
Manual de operaciones
www.zigor.com
60
Connection between the button and UPS REPO port (Table 5-8):
BUTTON
UPS REPO
DESCRIPTION
Pin 1
Pin 1
EPO-NA
Pin 2
Pin 2
EPO-12 V
Pin 1
Pin 3
EPO-NC
Pin 2
Pin 4
EPO-12 V
Table 5-8 REPO Connection
A remote emergency stop switch can be installed in a remote location and connection through simple wires to the
REPO connector.