Option 1

: Assemble on grass or dirt. Secure the 

canopy to the ground by inserting 8 ground stakes (S) 
through each base plate (K). 
Then tie the nylon strap (T) to each corner of the 
canopy roof (M) and secure the 4 remaining ground 
stakes (S). 
 
 
 
 
 
 

 

Option 2: 

Canopy must be installed on a firm level surface, 

regardless of surface type. To ensure safe use of this canopy, install 
foot plates permanently into poured concrete blocks or railroad ties 
or similar using suitable bolts. 

Instructions for Installation into Concrete: 
Note

: Expansion bolts for installation into concrete are included. 

1. Canopy must be installed on a firm, level surface. 
2. Concrete should be at least 4 in / 10 cm thick and properly cured. 
3. Assemble the canopy per the enclosed instructions. Using a 

marking pen, mark the location of the holes for the 8 foot plates 
where you want the canopy installed. 

4. Once the locations of the holes are marked, move the foot plates 

aside. Using a ¼ inch concrete drill bit, drill pilot holes for one foot 
plate. Once pilot holes are drilled, use a ½ inch concrete drill bit 
and drill to a depth that is the same length as the expansion bolt. 
Make sure the threaded bolt sticks out of the concrete. 

5. Place the expansion bolts into the holes that were just drilled. 
6. Reinstall the foot plates on each post and place foot plate over the 

expansion bolt. 

7. Recheck the locations of the holes previously marked for the 

remaining foot plates to ensure all holes are in alignment. 

8. Install washers, lock washers and nuts. 
9. Do not fully tighten each bolt on each plate. Alternate gradual 

tightening of all bolts on the plates until all plates are fully secured. 

 

INSTRUCTIONS FOR ANCHORING CANOPY TO THE GROUND 

Listed below are 2 options for attaching this canopy to the ground 

AWNING ASSEMBLY 

Attach awning arms (F) to the posts (

C1

) using bolts (H). See diagram below. 

Connect fabric fasteners on the roof (M) with the fabric fasteners on the side panels (N & O). 

 

 

Summary of Contents for 496840

Page 1: ...orage and should not be used for public gatherings Please check with your local regulations prior to purchasing this item Some municipalities have restrictions and requirements This canopy should not...

Page 2: ...rner 6 F Awning Arm 2 G Awning Front Girder 1 H Bolt M6x16mm 4 I Bolt M6x30mm 2 J Ring pin w hair spring cotter 2 K Base plate 8 L Bolt Nut 8 M Canopy Roof 1 N Side Panel with Awning 1 O Side Panel 1...

Page 3: ...eces D E as shown in the diagram below A Incline Bar B Horizontal Bar D 3 Way Corner E 4 Way Corner POST ASSEMBLY Part 1 Insert posts C C1 into the corners on one side of the assembled roof as shown i...

Page 4: ...at this point See SIDE AND END PANEL ASSEMBLY on page 5 POST ASSEMBLY Part 2 Insert the remaining posts C into the corners on the other side of the roof as shown in the diagram There are hooks attache...

Page 5: ...he steel frame using the elastic ball straps R Attention side panel with awning N must be attached to the side with posts C1 Insert the elastic strap through the grommet in the roof M then behind the...

Page 6: ...to the posts with the 3 hook 4 Insert the hooks into the pre drilled holes at and loop fasteners attached to the side panels the bottom of each post C C1 5 Insert the elastic ball strap R through the...

Page 7: ...the locations of the holes are marked move the foot plates aside Using a inch concrete drill bit drill pilot holes for one foot plate Once pilot holes are drilled use a inch concrete drill bit and dri...

Page 8: ...8 AWNING ASSEMBLY Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8...

Reviews: