background image

 

AWNING ASSEMBLY 

 
 

Step 1 

Step 2 

Step 3 

Step 4 

Step 5 

Step 6 

Step 7 

Step 8 

Summary of Contents for 496840

Page 1: ...orage and should not be used for public gatherings Please check with your local regulations prior to purchasing this item Some municipalities have restrictions and requirements This canopy should not...

Page 2: ...rner 6 F Awning Arm 2 G Awning Front Girder 1 H Bolt M6x16mm 4 I Bolt M6x30mm 2 J Ring pin w hair spring cotter 2 K Base plate 8 L Bolt Nut 8 M Canopy Roof 1 N Side Panel with Awning 1 O Side Panel 1...

Page 3: ...eces D E as shown in the diagram below A Incline Bar B Horizontal Bar D 3 Way Corner E 4 Way Corner POST ASSEMBLY Part 1 Insert posts C C1 into the corners on one side of the assembled roof as shown i...

Page 4: ...at this point See SIDE AND END PANEL ASSEMBLY on page 5 POST ASSEMBLY Part 2 Insert the remaining posts C into the corners on the other side of the roof as shown in the diagram There are hooks attache...

Page 5: ...he steel frame using the elastic ball straps R Attention side panel with awning N must be attached to the side with posts C1 Insert the elastic strap through the grommet in the roof M then behind the...

Page 6: ...to the posts with the 3 hook 4 Insert the hooks into the pre drilled holes at and loop fasteners attached to the side panels the bottom of each post C C1 5 Insert the elastic ball strap R through the...

Page 7: ...the locations of the holes are marked move the foot plates aside Using a inch concrete drill bit drill pilot holes for one foot plate Once pilot holes are drilled use a inch concrete drill bit and dri...

Page 8: ...8 AWNING ASSEMBLY Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8...

Reviews: