-ii
IMACS System Release 5.1.9
Reference Guide
Model No.
Running Head
2.7.1
Frame Relay Switch Port Savings ........................................................... 2-33
2.7.2
Frame Relay and Internet Service Provisioning ...................................... 2-33
2.7.3
IDSL Service Provisioning ...................................................................... 2-34
2.7.4
Grooming and Concentration in Cellular Networks ................................ 2-35
2.7.5
Frame Relay Concentration at Hub Sites................................................. 2-36
2.7.6
Frame Relay Server Specifications.......................................................... 2-37
2.8
Routing Server ............................................................................................. 2-37
2.8.1
Bundled Service Deployment .................................................................. 2-38
2.8.2
Private Intranet Deployment .................................................................... 2-39
2.8.3
IP Routing Server Specifications ............................................................. 2-39
3.1
Introduction ................................................................................................... 3-1
3.2
User-Set Switches and Jumpers ..................................................................... 3-1
3.3
Chassis Installation ........................................................................................ 3-1
3.3.1
Unpacking the Chassis and Cards.............................................................. 3-1
3.3.2
Pre-Installation Tips................................................................................... 3-2
3.3.2.1
Installation Checklist ............................................................................. 3-2
3.3.3
Choosing a Location for Your System ...................................................... 3-3
3.3.3.1
Rack Installation Tips ............................................................................ 3-3
3.3.3.2
Wall-Mount Installation Tips ................................................................ 3-4
3.3.3.3
Tabletop Installation Tips ...................................................................... 3-4
3.3.4
Installing the Chassis ................................................................................. 3-4
3.3.4.1
Front-Loading Chassis with Power Supplies on Side ........................... 3-4
3.3.4.2
Front-Loading Chassis with Power Supplies on Top ............................ 3-6
3.3.4.3
Two-Sided Chassis ................................................................................ 3-7
3.4
Power Supplies and Ringing Generators ....................................................... 3-8
3.4.1
System Power (Redundancy)..................................................................... 3-8
3.4.2
-48V Talk Battery Requirements ............................................................... 3-8
3.4.3
Setting the U.S./European Configuration Jumper ..................................... 3-9
3.4.4
Installing the System Power Cards ............................................................ 3-9
3.4.5
Talk Battery Supply Fuses ....................................................................... 3-10
3.4.6
AC Power Supply and DC Power Supply Fuses ..................................... 3-10
3.4.7
Installing AC or DC Power Supplies ....................................................... 3-10
3.4.8
Installing the -48V Converters (8903/8905) ............................................ 3-10
3.5
Ringing Generators ...................................................................................... 3-11
3.5.1
Ringing Generators (8906/890620) ......................................................... 3-12
3.5.2
Installing the 105V Ringing Generator (8906/890620) ........................... 3-12
3.6
System Power and Ground Connections ..................................................... 3-14
3.6.1
Front-Loading Chassis with Power Supplies on the Side (891630) ........ 3-14
3.6.2
Two-Sided Chassis (891830)................................................................... 3-17
3.6.3
Power Enhanced Chassis with Power Supplies in Front (891930).......... 3-20
3.7
Powering Up the System ............................................................................. 3-23
3.8
Installing the Other Plug-In Cards ............................................................... 3-23
3.8.1
Interface Cards (892260 / 892360 / 892460) ........................................... 3-23
3.8.2
CPU Card (880360) ................................................................................. 3-24
3.8.3
WAN Cards (800060 / 801060 / 801460)................................................ 3-24
3.8.4
Server Cards............................................................................................. 3-24
3.8.5
User Cards................................................................................................ 3-25
3.8.6
Connecting Cables to the Cards............................................................... 3-25