Error Messages
B-9
Switch request sent to port.
The system has sent your redundancy switchover command to the associated port.
Switchover must be made from the primary WAN.
You cannot switch to a redundant WAN port from another redundant WAN port. You can only
switch from a primary port to a redundant port.
Test function is not available.
The selected test is not available on the current port.
Test in progress. No changes from this screen.
You cannot change any settings in this screen while a port test is in progress.
TS Connection must be specified.
You must specify a time slot connection for the WAN circuit.
Voice CPU is not responding.
The voice CPU is not working. Power down the system, then power it up again.
WAN must be active (no loopback) to run BERT test.
You must turn off all WAN loopbacks before starting a BERT test on a WAN port.
Xconnect table can be accessed from primary WAN.
You cannot access the WAN cross-connect information from a redundant WAN port. Do this
from a primary WAN port instead.
Summary of Contents for IMA CS-200 System
Page 18: ...8 Table of Contents Model No Running Head Table of Contents...
Page 22: ...4 List of Figures Model No Running Head List of Figures...
Page 130: ...4 46 General Features Model No Running Head CPU Troubleshooting IMACS 200 General Features...
Page 148: ...5 18 WAN Ports Model No Running Head WAN port Troubleshooting WAN ports...
Page 202: ...9 14 High Speed Data Ports Model No Running Head...
Page 208: ...10 6 OHSU Ports Model No Running Head...
Page 230: ...12 16 IPR Model No Running Head IPR Configuration Screens and Settings IP Routing...
Page 264: ...A 12 System Standards and Specifications Model No Running Head IPR Server Specifications...
Page 274: ...B 10 Error Messages Model No Running Head...
Page 294: ...20 Glossary Model No Running Head Zero Code Suppression...