Repair, Parts Replacement and Calibration
After opening the meter, live parts may be exposed. There-
fore, the meter must be disconnected from the measuring
circuit prior to opening its case for repair, replacement of parts
of calibration. If repair or calibration cannot be avoided unless
the meter is open and live, this work must be performed by a
qualified person who understands the danger involved.
Faults and extraordinary Stress
When it must be assumed that the safe operation is no longer
possible, take the meter out of service and secure it against
accidential use.
It is assumed that Safe operation is no longer possible,
* when the meter shows oblivious sign of damage,
* when the meter no longer functions correctly,
* after a prolonged storage under adverse conditions,
* due to severe stress due to transportation.
2 Initial Start-Up
Battery
Fit the meter with battery (batteries) provided along with the
meter
please see chapter 16.1, page 27, before initial start-up of
your instrument, or after a lengthy period of storage.
Switching the Meter ON
Turn the Function selector switch from the OFF position to the
desired measuring function.
All of the segments of LCD are activated briefly.
A drawing of the LCD can be found on page 2.