INSTRUCTION MANUAL
Semi-automatic BOV Filling Machine Z-2323
A0310.02.2323.905.1.EN
Page 17/39
5.
Operation manual of Z-2323
Steps before starting the machine
Before starting Z-2323, make sure that following steps were taken:
The device is properly installed, compressed air supply and product supply is connected in
accordance with chapter 3.2.;
The appropriate value of operating pressure was set. If necessary, the adjustment must be
made in accordance with chapter 6.1.;
An appropriate dose of the product has been set. If necessary, the adjustment must be
made in accordance with chapter 6.2.
The height of the Filling and Cleaning head is suitable for the actually used type of
container. If necessary, adjust it in accordance with chapter 6.3.;
Position of the container limiters is appropriate for the diameter of container. If necessary,
adjust it in accordance with chapter 6.4.;
Starting the machine
Properly installed machine should be operated only by appropriately qualified personnel in
accordance with chapter 2.2.
First, place the aerosol container centrally in the axis of the filling head (correct positioning should
be set with the limiters in accordance with chapter 6.4). In order to start the machine:
1.
Open the manual cut-off valve on the air preparation unit located inside cabinet, by rotating
its switch counter-clockwise [Fig. 6, pos. 1]. This will provide air supply to the machine,
working heads will move to the top, starting position.
2.
Press Reset button on front control cassette [Fig. 3, pos. 6]
3.
Single cycle is initiated by using the footswitch – START [Fig. 6, pos. 2].
Fig. 6. Starting Z-2323 machine
3.
Filled aerosol container should be placed subsequently under cleaning head. The cleaning
cycle is initiated in the same manner as above.
Summary of Contents for Z-2323
Page 42: ...PNEUMATIC DIAGRAMS ...