Check total voltage and polarity of each battery string is correct.
Fig. 3-5 Battery connection example with A type cabinets
In case of doubt, contact our customer service (sac@zigor.com).
4
OPERATION OF ZGR TOWER PRO 6 10 KVA
The operation is simple; the user only needs to read the manual and follow the operation instructions listed in this
manual no need any special training.
4.1
Start up and turn off UPS
The ZGR TOWER PRO 6 10 KVA is a double-conversion on-line UPS that can operate in the following
alternative modes:
Normal mode
The rectifier/charger derives power from the AC mains and supplies DC power to the inverter while floating and
boosting charge the battery simultaneously. Then, the inverter converts the DC power to AC and supplies to the
load.
SAI
Battery
cabinet
WARNING
Battery type, aging or manufacturer should not be mixed. If you want to increase UPS autonomy or replace
batteries, contact ZIGOR customer service and follow our recommendations.
PRECAUCIÓN
Verifique que la suma de potencias de carga no superen el valor nominal del SAI para prevenir la alarma de