ZIMM Screw Jack
6 Installation
2015-01
Version 1.2
15
CAUTION
The system will run on!
Material damage to the entire system and the screw jack due to
running on.
•
The run-on travel may increase after the running-in phase.
If necessary provide a spring pressure brake FDB or brake motor.
NOTE
Additional hazards may arise during installation and operation of the
overall system.
Comply with regional regulations and take necessary measures
(such as risk assessment).
Document all additional hazards in the documentation for the
overall system.
6.1
Installing screw jacks and bevel gear drives
Ensure that the spindle of the ZIMM Screw Jack or on the ZIMM
Screw Jack cannot be exposed to lateral loads.
Fig. 6:
Side forces on the spindle are not permissible.
Fig. 7:
Flatness, parallelism and angular accuracy