INSTALLATION AND OPERATING INSTRUCTIONS:
Motor spindle, HF125-002 series
23
Zimmer GmbH
•
Im Salmenkopf 5
•
77866 Rheinau, Germany
•
+49 7844 9138 0
•
+49 7844 9138 80
•
www.zimmer-group.com
EN / 2020-11-25
DDOC00743 / -
10.2 Checking operational readiness
The product must be checked before commissioning. The checks that are described here must be carried out before each
instance of commissioning or operation of the product.
The product must never rotate or be operated without having carried out the commissioning test described here!
•
Check the tightening torques (product/mounting piece)
•
Check the power supply (lines and connections)
•
Check the operating parameters
• Check the standstill monitoring
•
Check the function, clamping force and nominal dimensions of the setting dimensions at the tool interface
•
Check the clamping states
• Check the cooling system
• Check the thermistors
• Check the grease distribution