Operations Manual | 11
Power Sequencing
a. Power up the system by turning ON the AC Power to the UPS Battery Cabinet. Make sure the BMS ON/OFF switch
on inside of cabinet door is turned ON.
• Allow 1 to 3 minutes for the BMS to initialize.
b. Log into the Web interface and verify that the BMS is Online.
• For Cloud Server option (external Internet access required) refer to Item 1.
• For Local Server option (BX50 internal server) refer to the BX50 Manual for how to connect.
• For MODBUS TCP/IP refer to the MODBUS Dictionary.
1. Browse to : https://manage.anzenbms.com/
2. Login using your assigned login. (Example: user1@userdomain.com)
3. Select the Assigned Systems tab and then select the cabinet which is being monitored.