Installation Instructions | 17
Appendix A
THIRD ANGLE PROJECTION
SPREAD FORKS TO FULL WIDTH OF CABINET.
ENSURE FORKS AND INSERTED FULLY AND LONG ENOUCH TO SUPPORT
ENTIRE DEPTH OF CABINET, OR CABINET MAY TIP DURING TRANSPORT.
MAXIMUM TILT ANGLE
±15° FRONT-TO-BACK
MAXIMUM TILT ANGLE
±10° SIDE-TO-SIDE
CAUTION:
HIGH CENTER OF MASS - USE CAUTION WHEN MOVING CABINET
ONLY PERSONNEL TRAINED TO MOVE HEAVY EQUIPMENT SHOULD HANDLE TH
ESE BATTERY
SYSTEMS.
USE A FORKLIFT OR SIMILAR DEVICE WITH APPROPRIATE LIFTING CAPAC
ITY TO LIFT THE
CABINET.
NOTE THE CENTER OF MASS LOCATION.
MOVE SLOWLY WHEN HANDLING. AVOID BOUNCING THE CABINET WHILE MOV
ING. THE
CABINET COULD FALL FORWARD/REARWARD OR SIDEWAYS IF HANDLED ROUG
HLY.
CABINETS ARE HEAVY. APPROPRIATELY RATED FORKLIFTS OR SIMILAR D
EVICES SHOULD BE
USED TO MOVE THE CABINET.
ENSURE FLOORS ARE LEVEL AND RATED TO CARRY THE WEIGHT OF THE CA
BINET.
PROCEDURE FOR BATTERY CABINET INSTALLATION:
REMOVE SIDE PANELS AND TIGHTEN ALL ELECTRICAL POWER CONNECTIONS
ON
1.
BATTERY TERMINALS UPON DELIVERY OF CABINET. SEE SHEETS 3 AND 6
FOR
ADDITIONAL INFORMATION.
INSTALL FLOOR ANCHORS OR DRILL FLOOR HOLES TO ALIGN WITH CABINE
T AS
2.
SHOWN ON SHEET 2.
MOVE CABINET INTO POSITION OVER OR ONTO FLOOR ANCHORS AND INSTA
LL
3.
ANCHORS.
INSTALL ANY ADDITIONAL ADJACENT CABINETS AND FASTENER THEM TOGE
THER THRU
4.
THE CORNER POSTS. REFER TO SHEET 4 FOR ADDITIONAL INFORMATION.
INSTALL THE BUSBARS AS SHOWN ON SHEETS 7 AND 8.
5.
ROUTE AND INSTALL THE DATA CABLES AS SHOWN ON SHEETS 7-13.
6.
SEE SCHEMATIC AND BARRIER STRIP DETAILS ON SHEETS 14 AND 15 FOR
ADDITIONAL
7.
INFORMATION.
INSTALL THE DOORS AND LOCK WHEN NOT OPEN FOR MAINTENANCE.
8.
THE CABINET IS RATED FOR SEISMIC INSTALLATIONS ACCORDING TO IBC
2018. CONTACT
ZINCFIVE FOR SEISMIC INSTALLATION OPTIONS. INSTALL THE SEISMIC
KIT ON THE FRONT OF
THE CABINET AS NECESSARY. REFER TO SHEET 4 FOR ADDITIONAL INFO
RMATION.
>IMPORTANT<
REVIEW THE DRAWINGS AND READ ALL
INFORMATION BEFORE PROCEEDING WITH MOVING
AND INSTALLING THE BATTERY CABINET.
CAUTION: HIGH VOLTAGE, RISK OF ELECTRICAL SHOCK
FOLLOW ALL SAFETY PRECAUTIONS WHEN WORKING ON THIS SYSTEM
ALWAYS WEAR PROPER PPE, INCLUDING EYE PROTECTION
GENERAL NOTES:
ONLY QUALIFIED TECHNICIANS SHOULD PERFORM INSTALLATION OR
MAINTENANCE OF THIS BATTERY SYSTEM.
ALL TOOLS SHOULD BE INSULATED TO PREVENT ELECTRICAL SHOCK.
OPEN DISCONNECTS BEFORE INSTALLATION OR MAINTENANCE.
CHECK DC VOLTAGE AT BATTERY OUTPUT AND UPS OUTPUT TO ENSURE PRO
PER
POLARITY BEFORE MAKING FINAL CONNECTIONS.
REVISIONS
ZONE
REV.
DESCRIPTION
DATE
APPROVED
H01
HVM RELEASE
1/31/2023
ASY, ZF38A6SU GEN 1.5 BASE
CABINET
H01
DO NOT SCALE DRAWING
00100-00400-00002
SHEET 1 OF 18
1/31/2023
D. DUKARIC
UNLESS OTHERWISE SPECIFIED:
SCALE: 1:20
WEIGHT: 950 kg
REV
DWG. NO.
C
SIZE
TITLE:
NAME
DATE
CHECKED
DRAWN
FINISH
MATERIAL
INTERPRET GEOMETRIC
TOLERANCING PER ANSI Y14.5-2009
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
ZINCFIVE. ANY REPRODUCTION IN PART
OR AS A WHOLE WITHOUT THE WRITTEN
PERMISSION OF ZINCFIVE IS PROHIBITED.
DIMENSIONS ARE IN mm. 3D
CAD FILE IS MASTER. ALL
FEATURES ARE AT BASIC AND IN
NOMINAL CONDITION.
INTERROGATE MODEL FOR
MISSING INFORMATION. ALL
FEATURES
10
A
B
C
.
A
A
B
B
C
C
D
D
E
E
6
6
5
5
4
4
3
3
2
2
1
1