ZinCo GmbH ∙ Lise-Meitner-Strasse 2 ∙ 72622 Nürtingen ∙ Germany
Tel. +49 (0) 7022 6003-0 ∙ Fax +49 (0) 7022 6003-100
E-Mail: info@zinco-greenroof.com ∙ www.zinco-greenroof.com
4
Installation manual
Tools required:
Wrench AF 13
Tighten nuts to a torque of 10 Nm
Cordless screw driver
Drill 3.5 mm in diameter
Mitre saw suitable for aluminium,
alternatively a 2” pipe cutter
Setting up the posts:
There are two possible angles for assembling the guardrail:
90° or 67.5°. Please see the relevant column below for the
steps required for each individual application.
Step 1: Loosen the transport safety device on the post module.
Loosen the marked nuts and remove the bolt.
Step 2: Place the post at the required angle:
Draw up the post to 90° and
insert the screw.
Draw up the post to 67.5°
and insert the screw.
Step 3: Fixing the posts
for a post at 90° angle
for a post at 67.5° angle
Fit washer and nut
and tighten.
Fit washer and nut
and tighten.
Step 4: Installing a protection mat on the roof.
Regardless of the required angle of the post on the guard-
rail, a protection mat with at least 300 g/m² is installed
across the entire area in line with the required green roof
build-up.
Step 5: Setting up the post module.
for a post at 90° angle
for a post at 67.5° angle
In each case, push the post right up against the parpet!
Step 6: Mount the handrails and the mid rails
Pipe mounting
for handrail
Post
Pipe mounting
for mid rail
Place the handrail/mid rail
on the pipe mounting
Tighten
the bolt
Installing the Fallnet
®
ASG