AP3/10, AP3/15 Installation Instructions
3
Contents
Specification
3
Dimensions
3
Special Notices
4
Installation
Requirements
5
Positioning
6
Plumbing
6
Electrical
6
Commissioning
7
Maintenance
Precautions
8
Schedule
8
Fault Finding
9
De-Installation
9
Warranty
10
Installation must only be undertaken by a
competent person, familiar with unvented
electric water heaters.
The Zip Aquapoint must be installed in
accordance with these instructions and all
current legislation, codes of practice and
regulations governing the installation of
unvented hot water cylinders in force at
the time of installation.