Page 2 of 24 HydroTap Installation and Operating Instructions - 89650UK - August 2011 v1.02
Installation Checklist:
A. Read
the
instructions.
B.
Note: Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
C.
Check the water pressure to determine if you require a pressure reduction valve or a flow
restrictor added or removed from the kit.
D.
Check the water quality to determine if extra filtration will be required.
E.
Check the appliance rating plate and ensure correct power is available for the appliance.
F.
Check the underbench cupboard supporting the appliance is adequate for
the total weight of the appliance, when full of water.
Before Commissioning:
1.
Check the unit has been secured correctly.
2.
Flush the supply line before connecting.
3.
Check all plumbing fittings have been tightened.
4.
Ensure the outlet and vent pipes are positioned to drain correctly.
5.
For undersink units ensure there is adequate ventilation.
6.
Check all tubes from the undersink unit to the tap, have a constant rise and there are no ‘S’
traps or kinks in the hoses.
7.
Check all electrical connections are correct and there are no loose wires.
Commission:
8.
Turn on the water and check for leaks.
9.
Flush the tap for 3 - 5 minutes.
10.
Turn on the power.
11.
Allow sufficient time for the unit to heat up, before using.
Check List