13
Installation instructions
802742UK V4.00 Sept 2018 - Zip HydroTap Industrial
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk www.zipwater.co.uk
Section 2
Ventilation
!
Important
Read this section in conjunction with section 5 Command Centre installation,
page 26.
When installing air flow vents, the following tools will be required
•
Jigsaw and drill or equivalent equipment.
•
Keyhole or wall board saw.
2.1 Generic requirements
Clearance envelope
•
A clearance envelope around all Command Centres must be provided to allow adequate
ventilation for the safe and effective use of the HydroTap G4 system.
!
535mm
50mm
50mm
Command Centre
width