OPERATION
ZIPPER MASCHINEN GmbH www.Zipper-Maschinen.at
22
ZI-HB204
22
13
OPERATION
Device to be operated in a perfect state only. Inspect the device visually every time it is to be used. Check in particular
the safety equipment, electrical controls, electric cables and screwed connection for damage and if tightened properly.
Replace any damaged parts before operating the device.
Operation instructions
W A R N I N G
Perform all machine settings with the machine being disconnected from
the power supply!
N o t i c e
Dust Collector must be connected, otherwise the machine will not start.
Planing
Connecting the dust chute
Lift up the blade arm A so that the longitude holes B being exposed; Pull out the key C on
both sides of the dust chute D; Move down the thickness table to the lowest position, and
insert the dust chute D; The dust chute D is so positioned that both keys C are in line with the
longitude holes B. Then push both keys C into the longitude holes B.
Planing of thin workpieces
In the case of thin workpieces, the planing shaft
Guard is over the whole planing shaft.
Feed of the workpiece indirectly with sliding wood.
Sets secure stand and guide the workpiece standing
over the planer shaft. Never stand Right or directly
behind the planing shaft.
C
A
B
D