For proper transport, follow the instructions and information on the transport packaging regarding
centre of gravity, attachment points, weight, means of transport to be used and prescribed transport
position, etc.
Transport the machine in its packaging to the place of installation. When lifting, carrying and
depositing the load, make sure that you are in the correct posture:
Lifting, Depositing
Ensure stability when lifting / setting down (legs hip width).
Lift / lower load with bent knees and straight back (like weightlifter).
Do not lift / lower the load jerkily.
Carrying
Carry load with both hands as close to body as possible.
Carry load with straight back.
14
ASSEMBLY
14.1
Checking Scope of Supply
Check the machine immediately after delivery for transport damage and missing parts.
14.2
The workplace
Choose a suitable place for the machine.
Pay attention to the safety requirements and the dimensions of the machine.
The selected location must ensure a suitable connection to the electrical supply as well as the
possibility of connection to an extraction system. Make sure that the floor can support the load of
the machine. The machine must be levelled simultaneously at all support points. It is also
necessary to guarantee a distance of at least 0.8 m around the machine. The necessary distance
must be provided for the feeding of long workpieces.
14.3
Assembling the machine
The machine is pre-assembled. Following assembly-steps are necessary:
Pull out the pre-assembled tilt-protection (A)
completely and secure it with the Allen screw (S).
Adjust the adjusting screw (B) to the level of the
table top to avoid wobbling of the machine.