14.3.1
Setting up a 400 V machine
•
The grounding conductor is yellow-green.
•
Connect the supply cable to the corresponding terminals in the input box (L1, L2, L3, N and
PE), see the figure below.
Plug connection 400V:
5-wire:
with
N-conductor
•
If a CEE plug (1) is available, the connection to the mains is made
through an appropriately powered CEE coupling (L1, L2, L3, N and
PE).
•
After the electrical connection, check the correct running direction
(rotation direction of the saw blade matches with the orientation of
the arrow on the saw blade). If the machine runs in the wrong di-
rection, swap two conductive phases, egg. L1 and L2, at the connec-
tion plug.
15
OPERATION
Only operate the machine when it is in a perfect condition. Before each operation, a visual inspection of
the machine must be carried out. Safety devices and operating elements must be checked carefully.
Check screw connections for damage and tight fit.
15.1
Operation instructions
Observe the following items prior to each start-up of the machine:
•
Check the saw blade for proper condition and tight fit. Replace damaged or worn saw blades
immediately.
•
Check the locking screw for height adjustment of the saw blade for tightness.
•
Fill the water basin with clean, cold water.
•
The filter must be completely covered with water in the basin.
•
Ensure that the water hose is not kinked at any position and the water flow valve is opened.