1
2
Hammer
5lb Sledgehammer
BETTER
10lb Sledgehammer
BEST
STEP T WO
1
2
Install Pipe
Locate where you would like the mailbox post to go and
using a sledge hammer, drive the pipe into the ground
approximately 18” (18 5/8“ above ground).
Please check level in both directions at about 6” intervals as
you pound the pipe into the ground. Usually, after the pipe is
about 12” into the ground, the trajectory of the pipe is
established and you cannot pull the pipe back into level.
With a helper, carefully lift the planter box assembly up and
over the pipe and place the mailbox post over the anchor pipe.
4
Majestic Mailbox Kit with Planter Box Instructions
DO-IT-YOURSELF
FRIENDLY PRODUCTS
Zippity
18 5/8”
2 Person Lift
Use block of wood
to Protect top of Pipe
from Mushrooming !