45
CHAPTER
FIRST START-UP
ZIRKONZAHN – OPERATION AND MAINTENANCE M2 MILLING UNIT COMFORT LINE – VERSION: 19/05/2021
NORMAL USE
Safety aspects
Titanium and other light metals may only be milled wet and the milling unit
OWUVPQVDGQRGTCVGFWPCVVGPFGFſTGJC\CTF
Insert all the tools into the tool magazine as far as they go. If the elaboration tool is not properly
inserted, this could lead to increased risks of injuries and faulty results.
Always wear protective equipment
Before starting any operation with the M2 milling unit, the following checks must be
executed in this order:
- Visual inspection of the protective casing for integrity and correct attachment.
- Functional check of the emergency switch: When the emergency stop switch and main switch
(lights green) are activated, the lighting of the main switch and the interior lighting switches
off immediately.
- Functional check of the magnetic switch on the front plate: If the lighting colour in the interior
does not change to another colour when the front plate is opened, there is a defect and the
milling unit could start unintentionally even when the front plate is open. The device must
not be operated in this condition.
- Visual inspection of the equipment's interior for possible damages or impurity.
If obvious defects or malfunctions occur during functional and visual inspections, contact
Zirkonzahn's Support immediately (Tel: +39 0474 066 630; e-mail: support@zirkonzahn.com).
If there is any danger to persons due to the defect, the M2 milling unit must not be used and must
be secured against unauthorised use. Notify Zirkonzahn's Support also for troubleshooting.
Summary of Contents for M2 MILLING UNIT COMFORT LINE
Page 1: ...m2 milling unit comfort line operation and maintenance manual...
Page 3: ...03 ZIRKONZAHN OPERATION AND MAINTENANCE M2 MILLING UNIT COMFORT LINE VERSION 19 05 2021...
Page 7: ...07 ZIRKONZAHN OPERATION AND MAINTENANCE M2 MILLING UNIT COMFORT LINE VERSION 19 05 2021...
Page 10: ...10 ZIRKONZAHN OPERATION AND MAINTENANCE M2 MILLING UNIT COMFORT LINE VERSION 19 05 2021...
Page 63: ...63 ZIRKONZAHN OPERATION AND MAINTENANCE M2 MILLING UNIT COMFORT LINE VERSION 19 05 2021...